Phone:
(848)318-7679
Physical address:
954 Vaughn Ave, Toms River 08753
Limestone surfaces & restored metal railings
Nashkov Group Construction LLC reconstructed these front steps by removing the old limestone and installing new limestone surfaces. The existing metal railings were dismantled, painted and reinstalled to complete the entrance. Follow the original condition, the removal work and the finished steps.
AFTER
BEFORE
Move the slider to compare the original steps with the completed limestone and restored railings. The final front view also includes the separately renewed walkway, which has its own project story below.
The stair work brought the limestone walking surfaces and the existing metal railings together as one entrance renovation.
Follow the original condition, the removal work and the finished result. Select a photograph to view the full image, then browse with the arrows, keyboard or a swipe.
Stage 01
The earlier front view shows the old stone step surfaces and the existing black metal railings on both sides of the entrance. Weathered edges and contrasting areas in the step finish are visible beneath the red front door.
This starting photograph provides the reference for the renewed limestone surfaces and restored railings.
Stage 02
The existing railings were taken down to allow access to the steps. The removal-stage photographs show the old finish coming away and the stair surfaces exposed for the replacement limestone.
Removing the old material opened the working area across the treads and the upper landing.
Stage 03
New limestone was installed on the front steps and upper landing. The pale stone surfaces define the walking areas and the front edges of the stair flight.
The angled finished view shows how the treads meet the entrance landing and the side of the staircase.
Stage 04
The metal railings were painted and reinstalled beside the renewed steps. Their black finish frames the pale limestone and reconnects the railings with the entrance.
The final front view brings the limestone, the restored railings and the red doorway together. The adjoining paver walkway was renewed as a separate part of the work.
Planning new limestone step surfaces or restoration of existing railings? Send Nashkov Group Construction LLC photographs of the entrance and your property location. We can discuss the scope, material choices and an on-site visit.
Discuss your step and railing project