All fence, gate & outdoor structure projects

Exterior panels, doors & a white finish

Storage Shed Reconstruction & Painting

Nashkov Group Construction LLC reconstructed and painted the exterior of this storage shed. The front wall was opened, new vertically grooved panels were fitted around the door openings, and a white finish brought the visible panels, door faces and trim together.

Before & after

Move the slider to compare the earlier condition with the renewed painted finish.

After reconstruction and painting: the renewed shed front with white panels, door faces and trim.AFTER
Before: the storage shed with worn front panels, peeling paint and weathered door faces.BEFORE
The worn front wall and door faces compared with the renewed exterior panels and white painted finish.

A renewed exterior for the storage shed

The photographs follow the front of the shed from its worn painted surface through the opened framing and new panels to the white exterior finish. The existing door arrangement remains the reference throughout the work.

Work included

The work focused on reconstruction of the visible shed exterior and painting. The progress images show the front cladding removed and the new panels fitted before the white finish.

  • Removal of the worn front wall cladding.
  • Exterior reconstruction around the existing door openings.
  • Installation of new vertically grooved exterior panels.
  • White painting of the visible panels, door faces and trim.

The work, step by step

Explore the earlier condition, the renovation scope and the painted result. Select a photograph to see the full image, then browse with the arrows, keyboard or a swipe.

Stage 01

The original storage shed

The starting photograph shows the shed with weathered front panels, peeling paint and worn door faces. The two door openings and front roof edge establish the existing exterior arrangement.

This view provides the reference for the replacement panel work and the later painted finish.

Stage 02

Opening the front wall

The old front cladding was removed, exposing the timber framing and the storage area behind it. The photograph shows the upright framing around the existing access openings.

Opening the wall made the area for the replacement exterior panels visible before the front was closed again.

Stage 03

Fitting the replacement panels

New vertically grooved panels were installed across the front of the shed and fitted around the door openings. The unpainted view records the renewed exterior surface and the trim outlining the openings.

This stage shows the reconstructed front before the white painting brought the panels and door faces into a more consistent appearance.

Stage 04

Painting the renewed exterior white

The visible exterior panels, door faces and trim were painted white. The new color carries across the reconstructed front and around the existing access openings.

The later view shows the renewed shed exterior, with the vertical panel pattern and white trim defining the front of the storage building.

Storage Shed Reconstruction & Painting

Use the arrow buttons or Left and Right keys to browse. On a phone, swipe left or right. Press Escape to close.

NASHKOV GROUP

Let’s talk about
your home.

Request a free consultation. Tell us what you have in mind, and we’ll get in touch.

Enter a phone number or email — at least one is required.

We’ll use your details to respond to this request.

Prefer email? info@nashkovgroup.com